Close

SIGN IN

Close

SIGN UP

Close

Forget password

Nhat Tan Bridge

Nhat Tan Bridge

Temple of Literature

Temple of Literature

Sapa

Sapa

Halong Bay

Halong Bay

Son Doong Cave

Son Doong Cave

Japanese Covered Bridge

Japanese Covered Bridge

Hoi An Ancient Town

Hoi An Ancient Town

Nha Trang Beach

Nha Trang Beach

Field trips

The ACF 2016 conference organiser plans site visits for registered delegates of the conference. These site visits will make your conference days in Hanoi even more effective and enjoyable. The arrangement cost including lunch will be inclusive in the delegates’ paid registration fee. 

 

 

ACF CONFERENCE 2016 SITE VISIT PROGRAM

 

Number of delegates: max 120 persons

Date: 3rd November 2016

Detail Schedule:

- 8:30: Depart from Marriott Hotel Lobby

- 9:00: Arrive the construction site of one station of Ha Noi Metro Rail System Project: Line 3 Nhon – Hanoi Station section.

- 10:00: Depart to the second site

- 10:30: Arrive the construction site of CT07 Boo young International Residence Building, Mo Lao urban area 

- 11:30: Lunch

- 13:00: Arrive Marriott Hotel

 

Information of the projects:

1. Ha Noi Metro Rail System Project: Line 3 Nhon – Hanoi Station section.

- Ownership: Hanoi Urban Railway Project Management Board

- Total length: 12.50 km (8.5 km elevated, 4 km underground); 12 stations (8 elevated, 4 underground). 

- Start date: September 2011, 

- Finish date (expected): December 2018

- Design: The French SYSTRA company

 

2. CT07 Boo young International Residence Building, Mo Lao urban area

- Owner: Booyoung Vietnam Co., Ltd,

- Location: Mo Lao new urban area, Ha Dong District, Ha Noi.

- Size: 30 stories, 2 basements

- Land area: 4,615 m2

- Construction area: 1883 m2

- Total floor area: 59,369 m2.

- Start date: December 2014

- Finish date (expected): August 2017

- Current construction progress: concrete work of 14th story